Goal: 142,800 AED
Construction of a 120-square-meter school consisting of 4 classrooms (30 m² each) + an administration office (20 m² each) + 4 restrooms (1.5 m² each) (built from the foundation with a concrete roof)Cost: 142,800 dirhamsPermit No.: 3/377/2023