Building and equipping a school with an area of 238 square meters, including 6 classrooms with an administration office and 4 toilets with a capacity of 192 students + digging an artesian well 80 meters deep, equipped with a pump, a solar energy system, and a water tank with a capacity of 10,000 gallons.
The cost of building and equipping the school: 234,000 dirhams
The cost of drilling the well: 31,000 dirhams
Total: 264,000 dirhams
Permit number:
Educational Solidarity/3/377/2023
Watering Water/3/379/2023